GURU NANAK CLINIC, LONDON

Working on existing buildings are projects that we love. This 1980s building has undergone several renovations and changes of use. We were asked to extended this building upwards and backwards which is nothing new to PH Design.

THE CHALLENGE

All works for the Clinic were to be undertaken in a live working environment. We worked closely with the Client, Architect and Contractor to ensure the structural design worked within the phases of the project to keep the Clinic running throughout the construction process.

We worked with the contractor to develop solutions and construction details as the existing structure was revealed.

 
 

KINGSMILL HOSPITAL, NOTTINGHAM

(FOR SKANSKA TECHNOLOGY)

A PFI hospital for the Nottinghamshire Trust, Hardip delivered the project to handover stage for the client. A construction value of £300m, spread over two site.

A mix of new building structures in designed in reinforced concrete and steel frame, the project also included a huge amount of refurbishment to its retained estate as well as infrastructure design including roads, underground drainage and retaining walls.

Hardip delivered the structural design for the Women and Childrens Building, Administration Block, FM Building, Retaining Walls, Link Building and Retained Estate refurbishment works packages.

 
 

DERBY CITY HOSPITAL, DERBY

(FOR SKANSKA TECHNOLOGY)

A £350m PFI project for the Derbyshire Trust, the design included a host of new buildings and extensive refurbishment works.

Basement works with contiguous bored piled walls and heavy infrastructure works on a sloping site made for an interesting and challenging project.

Hardip worked with the construction team to completed the detail design to handover.